Run #3 · Bakken_Test_2

2-step pump schedule · Numerical Reservoir 2 Stages · Solved in 2:14

2027-02-14 · 14:36:24 CST Cited B-14 calibration · 47 offset wells Run ID f3e9a2c1
Copilot · auto-summary

Run #3 produced a 412 ft propped half-length with 0.78 fluid efficiency. Compared to Run #1, half-length is 18% shorter due to the leaner 2-step proppant schedule (avg 0.62 lb/gal vs 1.34). Net pressure peak at 1,690 psi is on-trend with offset wells in the Bakken Middle.

Three things worth your attention before you act on this: (1) closure stress was kept at 0.71 psi/ft; the Bakken Middle trend is 0.74–0.76, so half-length is likely under-predicted by ~4%. (2) Conductivity vs X falls below 200 md-ft past x = 280 ft, so the tail of the propped region won't carry. (3) Run #2 (currently solving) uses a 4-step schedule that should recover the half-length without losing efficiency.

Pressure Over Time

Generated by Run #3 · pressure_field iter 70 · residual 1.4e-6
2,000 1,500 1,000 500 0 Net pressure (psi) 0 10 20 30 40 Time (min) peak 1,690 psi · t=24:00 Run #3 Run #1

Other charts in this run